01

Create a record of the existing installation

Photograph each sign in its surroundings, the mounting details and any accessible identification labels. Record dimensions, position, access and the condition of the supporting surface. Include interior logos and directional signs in the inventory so the change does not stop at the main façade.

Separate observations from assumptions. An old sign that still lights up does not establish that its power supply or fixing arrangement is suitable for a new construction. Gather any previous drawings or service records and ask the delivering specialist which elements need an on-site assessment.

  • Address, sign reference, location and photographs from agreed viewing points.
  • Existing dimensions, supports and visible cable routes.
  • Access requirements, local contact and operating hours.
  • Known documents and the condition of the wall behind the sign.
  • Items to remove, retain, investigate or replace.
02

Translate the new identity into a buildable sign

Review the new artwork at the available size. Different letter proportions or narrower strokes can change the required construction, even if the overall width remains similar. Ask for a technical proposal that identifies any adjustment before the brand team approves production.

Compare the unlit finish, lighting effect and mounting arrangement. If the new illuminated signage occupies less space than the old sign, the exposed wall becomes part of the project. Request a view showing both the new layout and the area that may need making good.

03

Assess reuse item by item

Ask the specialist to assess the suitability and condition of existing supports, connection routes and power components. Reuse should be a documented decision for the new installation, not an assumption carried over from the old one. Identify any inspection needed before a firm price can be given.

Separate sign production from removal, disposal or retention of the old components, wall repair and new installation. Clarify who handles each task and any building-owner coordination. Comparing signage quotes is easier when all suppliers work from the same inventory and stated assumptions.

04

Plan the changeover around business operations

Map the sequence: old sign removal, preparation of the surface, new fixing and connection, then commissioning and handover. Agree which work can happen together and which task must finish before the next starts. Delivery of the new sign is only one milestone in that sequence.

For an occupied hotel or operating practice, identify guest or patient routes and the available work periods. Decide how the entrance will be identified if the old sign is removed before the new one is ready. Assign one local contact to coordinate access and report unfinished preparation before the installation team arrives.

05

Control revisions across several locations

For multi-location signage, establish the common material, finish and lighting specification, then record the permitted variants. Each address still needs its own dimensions, mounting information and approval status. A pilot site can expose an issue before the same detail is repeated across the programme.

Use one revision number for each approved production package. If a site needs a different size or support, make the exception visible. Agree whether the rebrand will launch at all sites together or in phases, and plan site readiness and production releases accordingly.

06

Close the project with an updated asset record

At handover, record what was installed and where. Keep final drawings, daylight and illuminated photographs, component identification and operating instructions together. Include the agreed controls and maintenance access so future teams can identify the system without reconstructing the original enquiry.

Mark the old items as removed or retained, and record any remaining work. This gives the business an accurate starting point for a later repair, additional branch or next identity change. The result is a managed replacement project with a traceable specification.

Turn the requirements into a clear project brief

Global Signage Group

Share your artwork, dimensions and location to discuss the construction and identify a suitable specialist company.